GT Grandstands logo
Menu

Tinley Park High School

Tinley Park, IL

ADA renovation to the existing home side grandstand. Design, engineering, foundation, and installation included in scope of work.

  • ADA spaces cutout into the front row of seating sections (total of 12 spaces)
  • New front crosswalk framing to extend front walkway depth
  • New stair and handicap ramp combo off front crosswalk to grade
  • Handicap ramp designed to turn underneath the existing structure


  • Before

  • Before

  • Before

  • After

  • After

  • After